EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
HMCRV12
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (106)
Research
Workshop
- (5)
Empennage
- (6)
Fuselage
- (16)
Firewall
Tail Feathers
Wings
- (22)
-
Ready for flight?
-
Flaperon pushrod
-
Riveting Stiffening...
-
Pushrod to actuator...
-
Riviting wing tips...
-
Wing Fairing Electrical
-
Electrical Work on...
-
Positional Lights...
-
Wing lights
-
Wing tip
-
Wing Lights
-
Riveting the skins...
-
Wing Light Installation
-
Wing skins
-
Wing Tips
-
Bending tabs on wing...
-
Priming and sealing...
-
Inspecting wing ribs
-
Riveting the wings
-
Attaching Wig Skins...
-
Left Wing Riveting...
-
First Build Day:...
Controls
- (1)
Avionics
Lighting
- (1)
Instrument Panel
Landing Gear
- (2)
Engine
- (1)
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
- (1)
Tailcone
- (14)
Stabilator
- (14)
Rudder
- (8)
V Stabilizer
- (9)
AntiServoTab
- (4)
DrillBitHold
- (2)
Builder Name:
David Harris
-
Project:
Vans - RV-12iS
-
VIEW REPORTS
Total Hours:
235.5
Total Flight Time:
0.3
Total Expense:
N/A
Start/Last Date:
Aug 25, 2021 - No Finish Date
Engine:
Rotax 912is
Propeller:
Sensenich Ground Adjustable Composite
Friendly URL:
https://eaabuilderslog.org?s=HMCRV12
Home or Last Project Picture
Sep 01, 2021
First Build Day: Riveting the Wings
- (1 hour)
Category: Wings
7-12 students spent 1 hour inserting pop rivets into the wings (number of builders varied over the hour). For most builders, it was their first time working on the plane or riveting.
airplane4.jpg
airplane3.jpg
airplane2.jpg
airplane1.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.